InfoGrams are used to provide timely information to plant operators or owners when an event occurs at one power plant that has potential significance at other nuclear power plants.
A condensed list of InfoGrams particularly relevant to RRAS systems and products is given below.
For a complete list of InfoGrams or copies of particular issues, contact your RRAS Nuclear Parts Specialist.
Westinghouse also offers a password protected website containing these InfoGrams, as well as Technical Bulletins and Nuclear Safety Advisory Letters. Please complete the form below and return as indicated on the form for access to the site.
User Agreement and ID Request Form
| Number |
Subject |
| 1995 |
|
|
|
| 95-001 |
Errors on Figures in Rod Control System Technical Manual |
| 95-002 |
Information on Solid State Protection System Power Supplies |
| 95-004 |
7300 Card Frame Fuseholder |
| 95-007 |
Control Rod Drive Mechanism Stationary Griper Closing Time |
| 95-013 |
Barton Differential Pressure Indicating Switches |
| 1996 |
|
| 96-004 |
Solid State Protection System Safety Injection Reset Interlock Issue |
| 1998 |
|
| 98-001 |
Barton Model 580A Series Differential Pressure Indicating Switches |
| 98-002 |
7300 Process Instrumentation |
| 98-003 |
Type DHP Circuit Breakers - Auxilliary Switch Links |
| 98-004 |
NRC Information Notice No. IN 98-03 Concerns With Regard to Westinghouse Amptector Overcurrent Trip Devices |
| 98-005 |
DHP Breaker Motor Cut-off Switch Indicator Bracket |
| 98-006 |
Westinghouse Digital Metal Impact Monitoring System Invalid Channel Numbers |
| 1999 |
|
| 99-001 |
CDRM Stationary Gripper Closing Time |
| 99-002 |
RVLIS/ICCM Maintenance Terminal Date Anomaly |
| 99-003 |
Type DHP Circuit Breakers - Mechanism
Operated Cell(MOC)Switch Assemply Adjustment |
| 99-004 |
Rev. 1 Type DHP Circuit Breakers - Floor Tripper Adjustment |
| 99-005 |
RVLIS/ICCM Display Peripheral Interface Board |
| 2000 |
|
| 00-003 |
Nuclear Instrumentation System Power Range Channel Fine Gain Potentiometers |
| 2002 |
|
| 02-2 |
RCP Shaft Crack Investigation |
| 02-4 |
RCP Shaft Crack Investigation |